Curriculum for Industrial Installation VG3 / in-service training at a training establishment (IMO3-01)

Utgått


Det gis ikke lenger opplæring etter læreplanen, men det kan være mulig å ta eksamen som privatist. Se informasjon om siste eksamen på fagkodene som er knyttet til læreplanen.

Mer om gyldighet og innføring av ny læreplan

After Vg3

Assembly and testing

The aims of the training are to enable the apprentice to
  • plan and perform work according to current rules for Environment, Health and Safety and procedures
  • install mechanical components according to drawings, assembly instructions, specifications and standards
  • install electrical, pneumatic and hydraulic components according to drawings, specifications, standards and current rules and regulations
  • test and put products and production equipment into operation according to current rules, regulations and specifications
  • select and use oils, lubricants and fastening materials according to specifications and product data sheets
  • evaluate finished work tasks pursuant to requirements for the product and quality, and elaborate on the use of alternative solutions related to the selection of materials and methods
  • do repairs and maintenance on equipment one has installed

Tools and measuring equipment

The aims of the training are to enable the apprentice to
  • select and use hand tools and equipment according to the actual work task
  • select and adjust analogue and digital measuring equipment according to the job at hand
  • preset, adjust and calibrate installed measuring equipment based on specifications
  • perform measurements, control checks and record information that confirms work was done according to drawings and specifications
  • evaluate the results from measurement, correct any errors and document the result

Product control and documentation

The aims of the training are to enable the apprentice to
  • do control checks and document the fact that the product is acceptable in accordance with standards and the customer's specification requirements
  • do control checks and document that finished work was done according to current rules for Environment, Health and Safety, procedures and the quality assurance system
  • record and report deviations in the Environment, Health and Safety System and recommend corrective measures
  • give an account of the process from raw materials to finished product and the customer's requirements for the final product
  • fill in standardised documentation in English
  • use information and decision-making systems and give an account of the company's organization

Side 6 Av 7

Fant du det du lette etter?

0/250
0/250

Tusen takk for hjelpen!