Curriculum for Well drilling and rigging, sea-floor installations Vg3 / in-service training at a training establishment (BRH3-01)
Utgått
Det gis ikke lenger opplæring etter læreplanen, men det kan være mulig å ta eksamen som privatist. Se informasjon om siste eksamen på fagkodene som er knyttet til læreplanen.
After Vg3
Installations
- plan operations, carry out risk assessments, report deviations and non-conformances in line with routines and procedures
- service subsea tool systems for wellheads and give an account of how these work
- service subsea tool systems for wellhead completions and give an account of how these work
- service subsea tool systems for well workovers and give an account of how these work
- service subsea tool systems for replacing control modules, valves and pipe or steering cable pull-ins, and give an account of how these work
- discuss and elaborate on the advantages and disadvantages of subsea versus platform solutions
- perform installations according to installation programmes, procedures and current regulations
- give an account of official requirements for health for workers on the Norwegian continental shelf
- prepare final documentation for finished work and recommend corrective measures
Maintenance
- plan and carry out maintenance in line with procedures, drawings and maintenance programmes
- prepare subsea equipment and tool systems for well installations
- prepare production and injection equipment for completion works
- prepare tool systems for production and injection equipment
- prepare tool systems for replacing components that are installed on the sea floor
- troubleshoot and repair wellhead tool systems
- troubleshoot and repair production and injection equipment
- troubleshoot and repair tool systems for completion work
- troubleshoot and repair tool systems for replacing subsea components
- perform systematic maintenance on subsea tool systems at sea and in the workshop
- register and report deviations and non-conformance in English and Norwegian in line with the company's routines for these
Safety barriers
- service shut-down systems and emergency shut-down functions during wellhead installation and well workovers
- do service on control systems during wellhead installation and well workovers
- give an account of safety barriers related to well installations, wellhead installation and well workovers
- explain the placement of shut-down systems and emergency shut-down functions on offshore facilities used during well installation, wellhead installation and well workovers
6 av 7